Waste Water Treatment Plant for JBF Mangalore PTA Plant.

UEM was awarded a prestigious contract in November 2013 to build a WWTP for JBF Petrochemicals Ltd.
JBF with Technip as PMC is developing a 1.25 MMT p.a. capacity ‘Purified Terephthalic Acid’ (PTA) plant, which will be amongst the largest in India, in SEZ, Mangalore.  JBF needed an Effluent Treatment Plant to treat all liquid effluent streams coming from this PTA plant, and Utility Units.
UEM was selected to construct the WWTP consisting of Surge and Equalization System, Anaerobic Treatment System (including UASB reactor System & Bio gas handling system), Aerobic Treatment Section, Water Reuse Section – Tertiary Treatment by Ultra Filtration, heavy metal removal system & Reverse Osmosis system, Sludge handling & separation System. The treated water will be used for Cooling Tower make –up.
UEM will be looking after the entire Design, Construction and Engineering for the project, supply of equipment, testing of equipment, erection and commissioning of the complete treatment system including civil, technical,  piping, electrical, and instrumentation work.

 

CETP for HSIIDC

UEM has bagged yet another prestigious project in the NCR region.
This project that we have undertaken is for Haryana State Industrial and Infrastructure Development Corporation (HSIIDC).

HSIIDC was incorporated in 1967, with the objectives to develop industrial infrastructure in the State of Haryana under the aegis of Department of Industries and Commerce, Haryana.

HSIIDC has established an ‘Industrial Model Township’ at Manesar in 4358 acres of Land in Phase- I to VII. This industrial township comprises of 9 sectors (One Residential, two commercial & Six Industrial) for various type of industries having different characteristics of industrial effluent. At present phases I to VI comprising of 3628 acres of land has already been developed and requires treatment of effluent before final disposal on land/drain. At present the township has a CETP.

UEM will design, engineer, procure, construct, install & commission on a turnkey basis a new CETP of 25 MLD Capacity and the Up-gradation of existing CETP of 15MLD to 30MLD, with 120 months Operation & Maintenance of both the CETP’s for an average total effluent discharge of 55 MLD.

The Project Commenced in the month of February 2014